ORIO.IO LAB · SPC / 3
Status
A dated snapshot, not a live monitor.
PRE-LAUNCH Financial services are not enabled.
Financial services: not launched
Public wallet enrollment, purchases, redemptions, merchant checkout and production financial APIs are unavailable. No mainnet SPC 3 contracts are active through this release.
Test-network checks: passed November 14, 2026
Account-owned Alchemy and Infura endpoints agreed on Base Sepolia finalized block 58794597 at 18:44:58 UTC. Pimlico advertised EntryPoint v0.8. This proves one-time read connectivity and capability reporting, not current uptime or contract admission.
Engineering validation
181 local backend/database/execution integration tests, 39 contract tests and 4 credential-session security tests passed in the November 14 release preparation. Strict typechecking and packaged-service TLS, non-root and paused-state checks passed. These are local engineering results.
Open work
Hosted workload and database upgrades, deployed custody, consumer authorization and recovery, complete gas attribution, production contracts and accountable release acceptance remain outstanding.
Publication snapshot: November 14, 2026.
